Some pics from Saturday morning, before I slunk off to drier parts...
Smoke flue (Floor 2 adit) lit up:
🔗Autumn-08-Working-Weekends-Image-002[linkphoto]Autumn-08-Working-Weekends-Image-002[/linkphoto][/link]
DarkPrince grinding away old (and failed) metalwork in order to allow the gate to have the required clearance to open:
🔗Autumn-08-Working-Weekends-Image-005[linkphoto]Autumn-08-Working-Weekends-Image-005[/linkphoto][/link]
Stairway in Chamber 1 West illuminated during the installation of more slate steps to replace the rotten wooden ones. The remains of Floor A are visible in the gloom, about halfway up the photograph:
🔗Autumn-08-Working-Weekends-Image-007[linkphoto]Autumn-08-Working-Weekends-Image-007[/linkphoto][/link]
The same, viewed from the bottom of the stairs - these span two floors, linking Level 1 (Lake Level) with Floor B:
🔗Autumn-08-Working-Weekends-Image-009[linkphoto]Autumn-08-Working-Weekends-Image-009[/linkphoto][/link]
SimplyExploding? SimplyExploring cutting rebar into shorter lengths to be used as supports for steps:
🔗Autumn-08-Working-Weekends-Image-012[linkphoto]Autumn-08-Working-Weekends-Image-012[/linkphoto][/link]
Album here:
http://www.aditnow.co.uk/album/Autumn-08-Working-Weekends/
Hello again darkness, my old friend...