The only work with the current works in the valley that has a direct effect on Crofty are these: -
1. Demolition of the old mill - starting imminently.
2. Installation of 2no 400mm dia pipelines for pumped water to enter the V Notch Wier.
With regards to the pumping, looking at rebound figures for South crofty is a pointless exercise, as the current stated aim is to pump Dolcoath prior to Crofty - as far as I know there is no historic data for the rebound in Dolcoath, further to that it can be assumed that the water in Crofty would not have rebounded as quick (3 years) if Dolcoath was not flooded, as this accounts for pretty much the entire Western Boundary.