It would fit the what is shown on the plan.
It also raises the point, that if the owners had gone to these lengths to get the ore, presumably down, to their dressing floors below, then one heck of a lot of ore must have come out of Danby.
Which in turn must mean that there is more to this mine than what is currently accessible. I cannot envisage, a lot of ore coming out the sump in the horse whim, so either it came from the blocked left branch, or from stopes upstairs.
I understand CAT were bolting a rise in there in the Autumn, is anyone prepared to let us know about it?