The dig went very well, got 2 beams of steel in, need to put in another 2 with some more spiling.
Ended up using so far:
5 x 8' rail lines, 4 x 8' scaf poles, 2 x 12' scaf poles, 3.5m x 100mm I beam, 3 x 5' 3x5" fence posts
Still needs another long weekend session and should be done.
Very hard work, body aching in the places I did not know existed. We had 5 people each day and in the end this was a good number. A very big thanks to all that turned up:
Karl
Karli - COMRU
Ian S - would have been stuck without those scaf poles, barrels and tools
PeteHall – tools and rope
Skippy – drills and chisels. How well he used them, but then all the years of practice....
Though, he could not come, thanks to Pete for the first I Beam that we used up and the fence posts.
Mr Mike www.mineexplorer.org.uk