Well I have lot going on but here goes.
Frongoch: I refuse to bite the bullet about the fall on the 14. Its very unstable but with care a road through could be made. Problem is that tight crawl over the backfill to get there. I have started opening it out already.
Garlands report indicates a big zinc stope down to adit level, soon get it bolted for SRT.
Need to regain access to Engine Shaft as well.
Goginan: I intend to push the dig beyond the 'crush' as I call it. If its all caved in then its game over there.
Alltycrib/Talybont: The ladder shaft is reasonably passable again and I want to rip all the timber out of the upper section and packwall/ concrete. It needs to last as its the only access to deep adit.
Cwmystwyth:
Make a start on reopening Hen Barc (with SSSI approval)
Get permanent support under the sagging timber above the skipway (with SAM approval)
Do something about starting a road through the fall that blocks easy access to the skipway (with SAM approval)
The New Year should see the gateway signage in place and we should know what playing field we're on re the hydro
There is a few other bits and pieces and possibly some good news early in the New Year, but nothing to say on this as yet.