I was a deputy at Lofthouse Colliery and we used to do Inspections of Wrenthorpe Shaft and Pit bottom areas
also we checked a well shaft out on the surface on the
Sunday day shift,I worked on coal faces near the Wrenthorpe
shaft ,and on the weekend we yous to ride this shaft and
and be transported back to Lofthouse by the pit van or open
wagon,this was not good if it was raining.