Workings on Georgina Lode cut by the tunnel, 1965

The level of water normally in the tunnel for hydropower purposes can be judged by the branches left stranded across the entrance to this level on the Georgina Lode.

This photograph is by Alec and was uploaded December 14th 2009. © Alec please do not copy or distribute without prior express permission.

You can close this window to return to the main site.