Work started on 17/04/2016

Shutting placed the previous weekend, concrete poured on the day before, block work commenced. Intention is to get some support under the timber before removing the jack and continuing the concrete and block work towards the camera. The whole lot will eventually be packwalled in.

This photograph is by royfellows and was uploaded April 17th 2016. © royfellows please do not copy or distribute without prior express permission.

You can close this window to return to the main site.