Victory shaft 15 level pump chamber

Bob Orchard taking a note of pumping hours of the Harland pumps. (Pumping salt water from the Levant mine) These pumps were 3,300 Volt direct on-line start

This photograph is by Engineer and was uploaded January 26th 2014. © Engineer please do not copy or distribute without prior express permission.

You can close this window to return to the main site.