Treffry Viaduct

The viaduct, 650 feet (198 m) long and 100 feet (30 m) high, was the most advanced engineering project in the western peninsula. It was built of stone from the Carbeans and Colcerrow quarries,

This photograph is by carnkie and was uploaded May 6th 2009. © carnkie please do not copy or distribute without prior express permission.

You can close this window to return to the main site.