after the explosives - the results! Standard method of measurement - a packet of B and H gives the scale of the drainage trench - meant to be 900mm deep and 450 wide.
This photograph is by B175 and was uploaded December 10th 2016. © B175 please do not copy or distribute without prior express permission.
You can close this window to return to the main site.