After free draining stone was run into the adit to above water level a layer of Terram and then fill was placed before shaping up a trapezoid channel to fill with concrete along the length of the stopes and adit
This photograph is by B175 and was uploaded December 10th 2016. © B175 please do not copy or distribute without prior express permission.
You can close this window to return to the main site.