Taken only a year or so after the rest of the pit was demolished & the muckstack levelled. The unusual concrete headgear was left in place to suspend pumps, to control water levels. Shuttle-eye & Caphouse were still working at this time.
This photograph is by inbye and was uploaded December 1st 2012. © inbye please do not copy or distribute without prior express permission.
You can close this window to return to the main site.