Several buildings were located on this site associated with haulage from the drift and transfer to a cable hauled inclined tramway down to the standard gauge railway to Wollongong. Note encapsulated A4 sheets of paper stapled to the trees describing various features of the site.
This photograph is by larker and was uploaded December 1st 2016. © larker please do not copy or distribute without prior express permission.
You can close this window to return to the main site.