A fault runs through this section from left to right, between the excavator and rigg; bringing the base of the High Main seam down from above the excavator in the far wall to the right of the rigg in the foreground.
This photograph is by colin567 and was uploaded December 8th 2013. © colin567 please do not copy or distribute without prior express permission.
You can close this window to return to the main site.