C Floor Entrance 1981

The C floor level carried the main mine drainage below it's slabbed and timbered floor. It was interesting for the considerable variety of strengthening methods used to keep it open! These included a variety of iron girderings, slabbing, timbering and even concrete.

This photograph is by grahami and was uploaded November 13th 2008. © grahami please do not copy or distribute without prior express permission.

You can close this window to return to the main site.