Bentyfield Level entrance 13 October 2011

Showing excavation progress at end of second day. Temporary stone pile on RH side. Bridge rail found in collapse is laid on top of stone pile. Rail was in collapse debris and not on level floor.

This photograph is by PeteJ and was uploaded October 15th 2011. © PeteJ please do not copy or distribute without prior express permission.