This chamber was the site of the Incline down to D floor. The railings in the foreground are round the flooded shaft. In front of the wall are the mounting blocks for the later winding gear. The remains of the floor B bridge timbers can be seen on the tip behind the low retaining wall.
This photograph is by grahami and was uploaded June 26th 2009. © grahami please do not copy or distribute without prior express permission.
You can close this window to return to the main site.