Workings on Georgina Lode cut by the tunnel, 1965
The level of water normally in the tunnel for hydropower purposes can be judged by the branches left stranded across the entrance to this level on the Georgina Lode.
This photograph is by Alec and was uploaded December 14th 2009. © Alec please do not copy or distribute without prior express permission.
Rating
Nobody has rated this photograph yet, why not be the first?
Copy & Paste Forum Code
To display this photograph in a forum message please copy the text below and paste it into your forum message:
[photo]45192[/photo]
To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:
[link]45192[linkphoto]45192[/linkphoto][/link]