Victoria Tunnel - showing brick work etc.
Victoria Tunnel - showing brick work etc, down tunnel sets of 4-5 wagons would be lowered on a rope. The coals would then be loaded onto collier ships waiting on the Tyne.
This photograph is by John_L and was uploaded February 3rd 2011. © John_L please do not copy or distribute without prior express permission.
Rating
Nobody has rated this photograph yet, why not be the first?
Copy & Paste Forum Code
To display this photograph in a forum message please copy the text below and paste it into your forum message:
[photo]58602[/photo]
To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:
[link]58602[linkphoto]58602[/linkphoto][/link]