The G Floor Archway

When the arches were constructed, it was also necessary to protect the level which connected the head of the inclines to the foot of the vertical balance shaft. Again massive masonry was resorted to and the subsequent archway tipped over. This photo shows the archway intact before subsequent working broke through it. Just beyond Wil Roberts can be seen the waste which has collapsed into the end of the level below the boulder.

This photograph is by grahami and was uploaded October 8th 2007. © grahami please do not copy or distribute without prior express permission.

Rating

Nobody has rated this photograph yet, why not be the first?

Copy & Paste Forum Code

To display this photograph in a forum message please copy the text below and paste it into your forum message:

[photo]7300[/photo]

To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:

[link]7300[linkphoto]7300[/linkphoto][/link]