Slate waggons at Rail Wharf

These wagons are about 15cwt each and 30" gauge
A down train was generally a single wagon, carrying 4-5 tons of slate (12 trains/day between 8am and noon)
Up trains were normally a pair of wagons between 4pm and 6pm pulled by a single horse (horses were stabled at local farms)

This photograph is by Metman and was uploaded March 7th 2017. © Metman please do not copy or distribute without prior express permission.

Rating

(based on 1 vote)

Comments on this photograph:

  • A great record, thank you. (Teigl)
Copy & Paste Forum Code

To display this photograph in a forum message please copy the text below and paste it into your forum message:

[photo]110589[/photo]

To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:

[link]110589[linkphoto]110589[/linkphoto][/link]