Reconstruction of an incline.

As the pits grew deeper small tramways were built from the bottom of the pit up the deep slopes to the the tip. Small skips were filled with sand at the bottom and drawn by cable to the top where they were automatically emptied,

This photograph is by carnkie and was uploaded July 16th 2009. © carnkie please do not copy or distribute without prior express permission.

Rating

Nobody has rated this photograph yet, why not be the first?

Copy & Paste Forum Code

To display this photograph in a forum message please copy the text below and paste it into your forum message:

[photo]37638[/photo]

To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:

[link]37638[linkphoto]37638[/linkphoto][/link]