Lepton edge c1971
Taken only a year or so after the rest of the pit was demolished & the muckstack levelled. The unusual concrete headgear was left in place to suspend pumps, to control water levels. Shuttle-eye & Caphouse were still working at this time.
This photograph is by inbye and was uploaded December 1st 2012. © inbye please do not copy or distribute without prior express permission.
Rating
Nobody has rated this photograph yet, why not be the first?
Copy & Paste Forum Code
To display this photograph in a forum message please copy the text below and paste it into your forum message:
[photo]81117[/photo]
To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:
[link]81117[linkphoto]81117[/linkphoto][/link]