Inside road adit before lining
Road adit was driven in the 1950's to access the Ballymurtagh shaft from the old processing works. The level was in danger of collapse and water could have backed up and affected the now closed land fill site. Thus works were undertaken in 2005 to stabilise the adit.
This photograph is by mcrtchly and was uploaded February 20th 2009. © mcrtchly please do not copy or distribute without prior express permission.
Rating
Nobody has rated this photograph yet, why not be the first?
Copy & Paste Forum Code
To display this photograph in a forum message please copy the text below and paste it into your forum message:
[photo]30232[/photo]
To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:
[link]30232[linkphoto]30232[/linkphoto][/link]