G Floor Hub 24 N.O.V.
This was the "traffic centre" on G floor, from here levels led to the vertical balance shaft foot and beyond it to the North vein, levels went east and west and here too the draianage level began as well as the Archway level. The box suspended from the roof held electrical gear, as did the old sub-station in the background. This is the view looking west from the B series level.
This photograph is by grahami and was uploaded October 15th 2007. © grahami please do not copy or distribute without prior express permission.
Rating
Nobody has rated this photograph yet, why not be the first?
Copy & Paste Forum Code
To display this photograph in a forum message please copy the text below and paste it into your forum message:
[photo]7484[/photo]
To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:
[link]7484[linkphoto]7484[/linkphoto][/link]