A fault runs through this section from left to right, between the excavator and rigg; bringing the base of the High Main seam down from above the excavator in the far wall to the right of the rigg in the foreground.
Copy & Paste Forum Code
To display this photograph in a forum message please copy the text below and paste it into your forum message:
[photo]92045[/photo]
To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:
[link]92045[linkphoto]92045[/linkphoto][/link]