C Floor Entrance 1981
The C floor level carried the main mine drainage below it's slabbed and timbered floor. It was interesting for the considerable variety of strengthening methods used to keep it open! These included a variety of iron girderings, slabbing, timbering and even concrete.
This photograph is by grahami and was uploaded November 13th 2008. © grahami please do not copy or distribute without prior express permission.
Rating
Nobody has rated this photograph yet, why not be the first?
Copy & Paste Forum Code
To display this photograph in a forum message please copy the text below and paste it into your forum message:
[photo]25321[/photo]
To display this photograph in a forum message and link to the full size image please copy the text below and paste it into your forum message:
[link]25321[linkphoto]25321[/linkphoto][/link]